docs(board): reconcile the board against measured reality, evening of the go
PLN authorised the deletes, the CosmicFest tone and the gig page, so the board needed to stop describing a world where those were pending. Every row in the new block was measured today rather than recalled, which mattered: the standing 'catalog is STALE at 73 tracks / 23 gigs' warning is itself now false (81 / 25, as_of 2026-09-05), and the deletes that the board was waiting on a decision for have already run and been confirmed. The three remaining items all need PLN's screen or ears and nothing else, so they are listed as such instead of as work. Includes the verified prep for switching the shared checkout off rig-streamline, since that is the reason the running midiviz is still the old code.
Showing