Skip to content

  • Projects
  • Groups
  • Snippets
  • Help
  • This project
    • Loading...
  • Sign in / Register
T
Tidal
  • Overview
    • Overview
    • Details
    • Activity
    • Cycle Analytics
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
    • Charts
  • Issues 0
    • Issues 0
    • List
    • Board
    • Labels
    • Milestones
  • Merge Requests 0
    • Merge Requests 0
  • CI / CD
    • CI / CD
    • Pipelines
    • Jobs
    • Schedules
    • Charts
  • Wiki
    • Wiki
  • Snippets
    • Snippets
  • Members
    • Members
  • Collapse sidebar
  • Activity
  • Graph
  • Charts
  • Create a new issue
  • Jobs
  • Commits
  • Issue Boards
  • PLN
  • Tidal
  • Repository

Switch branch/tag
  • Tidal
  • TASKS_DUMP.md
Find file
BlameHistoryPermalink
  • PLN (Algolia)'s avatar
    docs(board): the release is one re-run from done, plus a pre/post-gig setup plan · 67b14a31
    Session of 2026-08-17/18 written back to the board for a cold reader, since the
    Task API is still unreachable from this session and the scratchpad — which held
    the release plan and every log — was cleaned mid-session. (The plan regenerates
    from canonical sources, which is exactly why it is a generated artifact; it now
    lands in Prod/Opal26_master/release/ rather than /tmp.)
    
    A3 rewritten: the SoundCloud uploader WORKS. `POST /tracks` never needed solving
    — it was the wrong door. Recorded the account's verified state (8 of 15 up, all
    private, including the 72:41 mix), the two DOM facts that cost a session each,
    and two defects a re-run will NOT fix by itself: take-five-drops uploaded 24 s
    short, and ghosts-in-the-toilets carries one malformed tag from before the
    chip-input fix. Also recorded that api-v2 is a dead end for BOTH create and
    update, so nobody re-opens it.
    
    A5: the YouTube adapter is built, with the finding that decides its architecture
    — the Data API cannot publish at all from an unaudited project.
    
    New EPIC G (Slopmotion release videos) carries the renderer's two landed fixes
    with their measurements, the one modal still blocking, and the 50-commit pull
    that inverted the app's mode semantics under us.
    
    New EPIC H is what PLN asked for: the long-term setup plan split into PRE-GIG
    (what must be true before playing again — the 59%-audible kick, orphan orbits,
    preload staleness, SC supervision, the LCXL v3) and POST-GIG (the release
    pipeline). Plus H3, the standing lesson: three confident conclusions this session
    were wrong the same way — a blind instrument reported absence — and PLN's own
    eyes beat the probes every time.
    PLN (Algolia) authored Aug 21, 2026
    67b14a31
TASKS_DUMP.md 27.4 KB
EditWeb IDE
×

Replace TASKS_DUMP.md

Attach a file by drag & drop or click to upload


Cancel
A new branch will be created in your fork and a new merge request will be started.