docs: board — session plan for the Opus shift: keystone is the v2 ghost still painting
Ground-truth pass found lcxl-leds-watch.service (the v2 LED watcher) still running beside the v3 driver — the likely author of the paint-reset mystery — and midi-autoconnect as the probable Midi-Thru→SC re-adder. Plan: kill the tug-of-war first, then the A1 label off-by-one, then the generalize thread PLN named (track-follow + live BPM from the cps knob), then the display probe with his eyes on the device.
Showing
Please
register
or
sign in
to comment